RSS were contacted by The London Borough of Hillingdon in March 2015 to solve the problem of moss and algae growth on wet pour surfacing.  Not only were the deposits unsightly but they were unsafe as they became very slippery during wet weather.

RSS used a high pressure cleaner and approved cleaning materials to remove the contamination and restore the surfaces to a clean and slip free condition reducing the risk of accidents and damage to clothing.

As can be seen on the before and after photographs the process is suitable for both wet pour and play tiles.  Also removal of the surface contamination reduces the risk of edge shrinkage and extends the life of the surface.

For further information, please call RSS on 01784 479271.